The residents of Bario Asal longhouse and adjoining Arur Layun village intend to install a micro-hydro system capable of producing a minimum of 10 kW of electricity on the Pa Merario River. The micro-hydro system will replace the current diesel generator which runs for only 3 hours each night and costs residents RM 900.00 per month.
It will provide the 47 houses (Appendix A) in Bario Asal and Arur Layun, and the village church with a constant supply of clean, renewable energy at a fraction of the cost of diesel power. Residents will finally be able to enjoy indoor lighting and some of the basic amenities most of us take for granted.
NEW UPDATES
Bario Asal - Arur Layun MicroHydro Fund Raising Dinner
Petabe papu ngan tauh. Few months back few of our "lun merar me anak adih" had a gathering at Dr. Balang Lemba'a's residence to discuss the construction of a MicroHydro for our Bario Asal-Arur Layun community. And the Main Committee suggested the ladies to organise a get-together cum fund-raising dinner for us.

The dinner arrangement is as follows :
Date
:
24th November 2006 (Friday)
Time
:
7.00pm
Venue
:
Imperial Grand Ballroom, 5th Floor, Imperial Hotel

We’ve requested the hotel to ready 40 tables - 30 tables to be sold at RM350.00 each and 10 tables sold at RM1,000.00 and above each.

The dinner tickets will be sold by table - suk nah belih ticket dih nah nakap lun manuh meja/belih ticket dih man. (Kan dataluh - tickets to be sold ngan lun tauh Bario Asal-Arur Layun tupu - spouses included of course.)

Contact below for tickets or more information :
Sekan Baraok (Fund Raising Committee)
email :
phone :
Picture Gallery
KERJASAMA - 2nd September 2006
Kerjasama with the Bario Asal and Arur Layun Community to clear the Powerhouse area and to clean out the old Hydro dam. A wonderful turnout by the community and we managed to get the gate valves open and removed a large portion of the silt.
(click on thumnail to view full picture)
designed & maintain by nicholas sagau.drop me a line at
-
24th November 2006 Fundraising golf tournament and dinner at Imperial Hotel, Miri.
-
4th December 2006 PACOS second visit to Bario, Watershed Management Program workshops, further site surveying and marking.
-
24th December 2006 Groundbreaking ceremony, hydro site, Bario. Kerjasama to build intake gabions and weir and excavate reservoir
-
25th December 2006
Muli Mikak Bawang in Bario Asal & Arur Layun, joint Christmas celebration (organized by the Bario Asal & Arur Layun youth)
-
ongoing works: Site preparation; collecting building materials, clearing path for PVC pipes, re-wiring all lights to energy saving bulbs, preparing for Watershed Management Program workshops